|
|
||||

| |
| Weather
|
|---|
| |
| Nam Theun 1 Hydropower Project, Lao PDR: Additional Site Investigation Works (For Detailed Design Stage) | |
| Soil Investigation Works for Garbage Disposal Site Extension Part No. 2, Sai Noi District, Nonthaburi Province | |
| Foundation and Construction Material Investigations for Huai Sa Duang Yai Weir, Lom Sak District, Phetchabun Province | |
| Foundation Investigation Works for Maikhao Project, (Four-Storeyed Hotel), Phuket Province | |
| Survey and Geotechnical Investigation Works for Feasibility Study and Detailed Design for IPP Project, Samut Songkhram Province | |
| Foundation Investigation Works for Port Construction, Phra Pradaeng, Samut Prakan Province | |
| Preliminary Survey of Existing Piles and Geotechnical Investigation Works for Jomtien Condominium Project, Pattaya City | |
| Existing Utilities Investigation by Ground Penetrating Radar at Sai Noi - Bang Bua Thong Junction, Nonthaburi Province | |
| Foundation and Construction Materials Investigation for Designing Works of Bang Pa In - Nakhon Ratchasima Motorway Project - Section 1 | |
| Rockline Checking for Road Tunnel Construction, Muang, Khon Kaen Province | |
| Foundation Investigation for Map Ta Phut Deep Sea Port, Rayong Province | |
| Geotechnical Investigation Works of Majestic Tower (Ocean 1) | |
| Foundation Investigation and Groundwater, Well Drilling & Development for the Construction of Antimony Metallurgical Plant | |
| Nam Theun 2 Hydroelectric Project, Lao PDR, Drilling Works for Making Holes in Drainage Tunnel and Drainage System Tests | |
| Geological and Foundation Investigation for Residual Pond No. 9 and Subsurface Drian No. 1, 2 and 3, Zinc Metallurgical Plant | |
| Feasibility Study and Detailed Design for Water Main System, Sewerage and Wastewater Treatment System, Koh Chang Area, Trad Province | |
| Nam Theun 2 Hydroelectric Project, Lao PDR, Drilling and High Pressure Water Test in Pressure Tunnel | |
| Soil and Construction Material Investigation for Four - Line Highway Extension (Phase 2), for Highway No. 11, Uttaradit to Den Chai | |
| Geotechnical Investigation Along Subway Route : Blue Line Extension, Bang Sue - Tha Phra, Bangkok | |
| Foundation Investigation for Sea Ports for Koh Chang and Nearby Islands, Trad Province | |
| Nam Theun 2 Hydroelectric Project, Lao PDR, Geotechnical Investigation Works for Detailed Design of CW3 Package | |
| Foundation Investigation and Plate Bearing Test at Yokohama Gomu Factory Extension Project | |
| Geotechnical Investigation for Sriracha Tower 3 Project | |
| Nam Theun 2 Hydroelectric Project, Lao PDR, Foundation Investigation for Seven Bridges | |
| |
Soil Investigation for Checking the Reservoir Construction at Nong Prajak Silaphakom, Udon Thani Province |